Installation

The real homerun.

Total installation time is roughly two hours of work, spread across a few days to allow joint compound and finish coats to dry. No specialty trades. No proprietary tools.

OnyxEon installation flange detail

Finished Installation

Backlit natural stone strip: wall to ceiling continuous revealBacklit ultra-thin stone column installation

A continuous reveal of natural stone, lit from within. The aluminum housing terminates flush with the drywall. No trim, no shadow gap, no visible seam.

Rough-in

01

Rough-in

Cut the recess and run 12V wiring to the fixture location. The aluminum housing slips into the cutout. No special framing required.

Mud & finish

02

Mud & finish

Drywall finisher applies joint compound over the perforated flange. The fixture disappears flush with the wall or ceiling.

Stone in, lights on

03

Stone in, lights on

After the final coat dries, the natural stone face slides into the housing. Connect to the 12V driver and reveal the finished installation.

Need installation guidance?

Our team supports designers, builders and authorized dealers throughout every project.

Contact Support